15,000 bpd Oil Refinery - Topping Plant

15.000 BPD – Oil Refinery

Oil refinery at a glance

General information

The refinery was commissioned ~1988/1989 and shut down in 1990. The topping plant type oil refinery was mothballed under Nitrogen.

One refinery is dismantled and stored for shipping. One more is also available and has to be dismantled.

Particularly, the refinery processed heavy crude oils API 23.7 – 34, with Sulphur contents of 2.0 – 3.63. Under Heavy Crude Oil operation, the capacity is 13,000 bpd.

Processed feed Crude Oils: Basrah Regular, Medium and Heavy.

Products: Naphtha, Diesel, Fuel Oil

Process units Barrels per day
Crude Oil Distillation 15,000

Disclaimer: Although the statements and technical information contained herein are believed to be materially accurate as of the date hereof, no representation or warranty is given as to the accuracy of any of the information provided.